FREE TOOL FOR CONTRACTORS
Bid Every Job to Cover Your Costs and Make a Profit
Busy all year and still short on cash usually means the bids are too low. Here is the math that fixes it.
The formula
Bid price = (Direct costs + Overhead) / (1 – Profit margin)
- Direct costs are what this job alone costs: materials, labor, subs, equipment, permits, dump fees.
- Overhead is this job’s share of what you pay to stay in business: insurance, trucks, office, software, your time estimating.
- Profit margin is what is left over as a percent of the price.
Step 1: Find your overhead percentage
Take last year’s overhead and divide it by last year’s direct job costs. If you spent $90,000 on overhead and $600,000 on direct job costs, your overhead rate is 15%. Every job needs to carry 15% on top of its direct costs just to break even. If your books are not clean enough to pull those two numbers, that is the first thing to fix.
Step 2: Price the job
| Materials | $8,000 |
| Labor: 120 hours at $55 burdened | $6,600 |
| Subcontractors | $3,000 |
| Equipment, permits, dump fees | $800 |
| Total direct cost | $18,400 |
| Overhead at 15% | $2,760 |
| Bid price for a 10% net profit | $23,511 |
| Net profit | $2,351 |
| Markup on direct cost | 27.8% |
“Burdened” labor means the wage plus payroll taxes and workers comp. Bidding at the bare wage is one of the quietest ways to lose money on every job.
Why “10 and 10” falls short
Many contractors add 10% for overhead and 10% for profit. On the same job, that gives $18,400 x 1.10 x 1.10 = $22,264. With real overhead at 15%, the profit is only $1,104, a 5.0% margin. You think you are making 10% and you are making half that. On a $1 million year, that gap is about $50,000.
| 10 and 10 | Priced from your real overhead | |
|---|---|---|
| Bid price | $22,264 | $23,511 |
| Net profit | $1,104 | $2,351 |
| Net margin | 5.0% | 10.0% |
Step 3: Check the job after it is done
A bid is a guess. Job costing tells you whether the guess was right. Track actual labor, materials, and subs against each job so the next bid is sharper. Our bookkeeping for contractors sets that up for you.
Free download: the bid calculator in Excel
Five calculators in one workbook: job bid, hourly rate, markup and margin, break-even, and rental cash flow. Type in your numbers and the answers update. Works in Excel and Google Sheets. No email required.
Common questions
What is a normal overhead percentage for a contractor?
It varies widely by trade and size, so use your own. A one-truck operation and a 20-person firm with an office have very different overhead. Your books from last year are the most reliable source.
Should overhead be a percent of direct costs or of labor?
Either works if you are consistent. Percent of direct cost is simplest. If your jobs swing between material-heavy and labor-heavy, spreading overhead by labor hours can be more accurate.
What about contingency?
Add it as its own line in direct costs for jobs with real unknowns, like older homes or tight schedules, rather than padding your profit number.
Know Which Jobs Actually Make Money
We clean up the books, set your real overhead rate, and set up job costing so every bid is built on facts. Free 20-minute call.
